drusba
I went to Iowa once, and it was closed.
- Joined
- Aug 19, 1999
- Messages
- 14,845
The DVC reservation site is now showing that the boardwalk view rooms will be open for reservations starting tomorrow for Nov 24, 2023 and after. Thus, the total block-out period is now set for Sep 9 through Nov 23, 2023.
Note that does not mean that the total actual refurb period for the boardwalk view rooms, or BWV rooms in general, will be only that 2 1/2 month period of time. An actual refurb of the entire resort usually takes close to a year. That block-out period is thus likely designed for some work planned for the outside of the rooms. The internal refurb will likely be done in the same type of pattern as prior BWV refurbs -- they start with half a floor, usually the fifth, and do rooms on both sides of hallway at the same time. When half a floor is finished, they start the other half, and after a floor is finished they move to the next floor.
Note that does not mean that the total actual refurb period for the boardwalk view rooms, or BWV rooms in general, will be only that 2 1/2 month period of time. An actual refurb of the entire resort usually takes close to a year. That block-out period is thus likely designed for some work planned for the outside of the rooms. The internal refurb will likely be done in the same type of pattern as prior BWV refurbs -- they start with half a floor, usually the fifth, and do rooms on both sides of hallway at the same time. When half a floor is finished, they start the other half, and after a floor is finished they move to the next floor.
Last edited: