Hmm..I just called and they totally downplayed the construction. I was told "minor" refurbishments to the villa pool and the far end of the marina will be under construction, nature trail closed. I mentioned Dis and was told that lots of what I read was misinformation (really? LOL).
ETA I called back and was persistent and finally spoke to GS. The GS-CM immediately offered to switch us to Poly under the same pricing as BB offer. I was a little hesitant due to East Pool construction but took the offer. Along the way I was told by initial contact CM that there was minor construction at WL, next agent (BB) told me that he could switch me for more money to Poly or GF, then when I persisted that I wasn't happy since we planned a resort day and had already budgeted the trip, was switched to GS who moved us for no price change.