No one can really answer that. Permits for construction go all the way through 2017. September 2017 is currently 18 months out, which is a lot of time for the project to have delays in.
Presumably, the leisure pool ought to be done, but the bungalow construction is likely to have ongoing impacts to most other amenities and is the piece with the longest time horizon.