bigskip
Mouseketeer
- Joined
- Jun 27, 2013
- Messages
- 232
Somebody anyone listen. I can't tell my DD's three a day.
Have they taken away the standby lines?
Somebody anyone listen. I can't tell my DD's three a day.
Have they taken away the standby lines?
.If either of your kids don't make the height requirement for some of the bigger rides, you can use rider switch and basically double your FP+ selections and get around tiering. That is what we are doing on our trip and many others have done as well.

If I don't have one small enough for rider swap, should I have another?![]()

Wow, the expense some folk are willing to go to for that extra set of FP's![]()

If I don't have one small enough for rider swap, should I have another?![]()
If it IS going away, nobody knows WHEN.
And, with the Dwarf's Mine Train opening soon, looks like MK might even have to ADD it.
Yeah, that might be a little drastic. I might have to go back to my "rent a baby" plan instead.![]()

I don't mind the three FP+ limit for advance booking, but once you are in the park, you should have the option to schedule another FP so long as it does not conflict with an existing one.
Say I schedule a Soaring FP+ for noon. If I still decide I want to do RD, I should be able to schedule a TT FP as soon as I enter the park as long as it is not at noon. From there, the old rules could apply. I cannot schedule another one until the window opens up or two hours have passed. This would benefit those who like to sleep in and those who like to get there early.
The only other change I would make is to allow 4 or 5 scheduled FP+ in advance at MK. There are so many more rides to spread out the masses, and if I can ride more rides quicker then my time is freed up to spend my money elsewhere in the park.
You can borrow mine for the low cost of 2 plane tickets to Orlando, accommodations and park tickets. You can even use my tier 1 FP!![]()

I think this would be true if they had 2 new headliners opening, but with just the one new ride 7DMR is going to sell out just as fast with tiering as without.
Well, for now I'm just going back to DLR. I'll keep your offer in mind for 2015 though! By then one of my college students will have graduated, so I might be able to afford more options!![]()
A great many WDW trips include 2-3 days visiting MK.
If the MK Top Tier included 7DMT, Splash Mtn., and Space Mtn. many guests
would not choose 7DMT on their second and/or third MK day.
That's how it could spread out the 7DMT FP+ to multiple guests.
Uh oh, by then he might be too tall! Does this mean I need to have more rider swap babies too? The things we do for FP...
Could we soon see threads telling people ways to get their too tall kids to make it under the bar on headliner rides? Slouch kiddo, slouch! Go later in the day when spines are compressed! Wear only the flattest of flip-flops!

Don't forget to shave their heads.....![]()

And Peter Pan. That could be MK's Maelstrom.I agree. Especially when you put A/E into the mix. I'd maybe even put ETWB in that mix because it's so low capacity and seems to be the one I keep hearing about running out first.
I know we typically do MK 3 or 4 days. Without tiering, I would probably choose 7DMT every day. With tiering we'd probably feel we need to mix it up a bit.
And Peter Pan. That could be MK's Maelstrom.
