The refurb of VWL has started and the 5th floor is now complete. The elevators and stair wells have been locked out for the 5th floor until today. I wandered up and asked if I could take a look. I was allowed into a studio and took the following photos:
I also spoke with one of the managers at the front desk and they said that the villas would not be getting sleeper CHAIRS. It did look like there was a pull out bed like the ones at VGF.
Construction personnel have been using a completely refurbed unit on the 4th floor as a construction office. This unit was a two bedroom (one bedroom plus studio lock off). Construction noise from the 5th floor has lasted till 11:00PM.
The new units appear a bit brighter than the old ones. There is a tan or beige carpet in the bedroom part of the unit and vinyl that looks like wood in the entry and sink area. The bathroom has a standard tile floor.







I also spoke with one of the managers at the front desk and they said that the villas would not be getting sleeper CHAIRS. It did look like there was a pull out bed like the ones at VGF.
Construction personnel have been using a completely refurbed unit on the 4th floor as a construction office. This unit was a two bedroom (one bedroom plus studio lock off). Construction noise from the 5th floor has lasted till 11:00PM.
The new units appear a bit brighter than the old ones. There is a tan or beige carpet in the bedroom part of the unit and vinyl that looks like wood in the entry and sink area. The bathroom has a standard tile floor.