Folks,
I haven't seen much about the hotel/dvc being built behind Trails End since the Covid-19 shutdown so I went out on Google Earth and grabbed the most recent satellite photo from March 28, 2020. I can't recall when most big construction projects got shut down (soon after the Covid shutdown?) but today being May 7, 2020 means it probably hasn't changed a whole lot since this photo was taken. This is what it looks like:

Note I've added three pushpins for reference.
At the bottom is the new Tri-Circle-D Ranch Horse Barn (since the old one is gone I guess this one is operational now or they are temporarily storing the horses off-site). Note the dark brown squiggle rectangle "under" the barn is where the shoeing will take place now.
In the middle is the Pioneer Hall complex with Hoop Dee Doo Review and Trails End. Across the way is still the Settlement Trading Post with the new playground in between that we've seen pictures of. However, the outline/perimeter appears to be a "hidden Mickey" shape with the darker fill/play surface. Does that to you?
Over on the left side there is a borrow pit where the "borrow" sand/dirt from that spot (leaving a hole) to build up and improve the drainage of the build site. This technique was used in a few different places then the Star Wars Land and hotel were built over at Studios. (hotel still under construction). The road to bottom left is the campground road that goes by loop 2000 (and to the new entrance/construction road off the old STOL runway. And finally the road off to the left side is the old road to Wilderness Lodge that has the Exercise trail next to it.
Other than the barn and the few sediment/runoff ponds, not much to see yet. But you can see the building outline behind Pioneer Hall starting to take shape and the pool/lazy river area in the gray center circle area.
What do you folks think?
Bama Ed
PS - I don't know if I want them to hurry up and get the build finished or take their sweet time....
I haven't seen much about the hotel/dvc being built behind Trails End since the Covid-19 shutdown so I went out on Google Earth and grabbed the most recent satellite photo from March 28, 2020. I can't recall when most big construction projects got shut down (soon after the Covid shutdown?) but today being May 7, 2020 means it probably hasn't changed a whole lot since this photo was taken. This is what it looks like:

Note I've added three pushpins for reference.
At the bottom is the new Tri-Circle-D Ranch Horse Barn (since the old one is gone I guess this one is operational now or they are temporarily storing the horses off-site). Note the dark brown squiggle rectangle "under" the barn is where the shoeing will take place now.
In the middle is the Pioneer Hall complex with Hoop Dee Doo Review and Trails End. Across the way is still the Settlement Trading Post with the new playground in between that we've seen pictures of. However, the outline/perimeter appears to be a "hidden Mickey" shape with the darker fill/play surface. Does that to you?
Over on the left side there is a borrow pit where the "borrow" sand/dirt from that spot (leaving a hole) to build up and improve the drainage of the build site. This technique was used in a few different places then the Star Wars Land and hotel were built over at Studios. (hotel still under construction). The road to bottom left is the campground road that goes by loop 2000 (and to the new entrance/construction road off the old STOL runway. And finally the road off to the left side is the old road to Wilderness Lodge that has the Exercise trail next to it.
Other than the barn and the few sediment/runoff ponds, not much to see yet. But you can see the building outline behind Pioneer Hall starting to take shape and the pool/lazy river area in the gray center circle area.
What do you folks think?
Bama Ed
PS - I don't know if I want them to hurry up and get the build finished or take their sweet time....