SpaceshipEarth
Earning My Ears
- Joined
- Mar 27, 2008
- Messages
- 62
I called up to add-on 100 points with the intention of requesting two 50-point contracts. But with the new policy of charging closing costs, my guide told me it would be less expensive for me to go with one contract. I ended up paying about $160 in closing costs for one contract, but what I am now reading, two contracts would not have been that much more expensive.
So did I make a mistake by going with one 100-point contract? I realize that it probably doesn't matter if I never sell my contract, but I don't know if I ever would. Do smaller contracts really fetch a higher price or is 100 points considered a small contract?
So did I make a mistake by going with one 100-point contract? I realize that it probably doesn't matter if I never sell my contract, but I don't know if I ever would. Do smaller contracts really fetch a higher price or is 100 points considered a small contract?