i am confident that hes talking out of his butt on that oneHe said that phase 2 is a "nighttime lighting package" that needs to wait until after construction on the physical land is complete to begin working on it, so maybe Pandora Daytime opens on Earth Day and Pandora Nighttime opens within six months...?
, Pooh, Tea Cups, Speedway, EE, Safari, and TSMM. These only had one point being used. Lots of delays and confusion at a lot of the FP+ points. More than I remember seeing previously.