The diagram of the declared units for kidani village is showing units on the other side of the lobby. Does this mean the rooms are finished? Does this mean on May 1st there will be rooms on both sides of the lobby ready?? We will be there on May 1st and thought only one side of the lobby would be finished. Looks like their ahead of schedule:)
 
Most of the declared units at AKV have been nothing more than concrete shells at the time they were declared. All of the units declared so far appear to be in Phase 1 of Kidani since we've had no reports of any occupancy dates other than May 1, 2009 so they should be open by that date. The part of the building that is just beyond the pool area (the part of Kidani that is the longest walk from Jambo House) is in Phase 2 and none of those units have been declared yet as far as I know. The occupancy date for those units is supposed to be some time in Sep 2009.
 











DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter

Back
Top Bottom