The construction will impact more and more of the resort as major construction ramps up with more physical site work beginning to go vertical to hang Steel Framing for the new DVC building infrastructure.
My concern would be if they need to drive pilings using hydraulics (now that would be noisy) for the foundation of the 5 floor building. It really depends on the ground stability testing.
Note: ground stability has so for prevented another hotel between the Polynesian and the Contemporary resort moving forward.
Dave