Impact of Exterior Refurbishment at WL/CCV

PetePanMan

DIS Veteran
Joined
Oct 4, 2010
Messages
1,544
Looks like the exterior refurbishment has now been extended through 2026. We have seen various photos which show massive, multi-story scaffolding with stairs etc. (for entire wings, all floors). We had booked for April but are now considering a change. We simply don’t want to risk having to look out on this construction as we love sitting on our balcony.

Given the scale of the scaffolding, we are assuming that affected rooms are still being booked but want to check in with others to find out what others may have experienced.

Any info appreciated
 
1










DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter

Back
Top Bottom