Rides during MM? Twice we've done:
- PP (one of the first two on).
- Dumbo - first (or second cycle)
- Alice - 2-3 families in line
- Matterhorn - one side then...
- Matterhorn - the other side.
- since they were loading.... hopped on Teacups, then
- Toady (but if Teacups aren't loading i'd do Toady first)
- Carousel (since it was loading)
- if not loading, Pinocchio or Snow White (then Carousel).
We'd bail at that point since it was :55 & time to get our first FP. (& ride Pinocchio & or Snow White later since they don't have much if any line)
So since we didn't get to Snow White during MM, we did 9 twice.
7-9 is easily doable (even with a quick bathroom break behind Alice after the Matterhorn). But only if you are first on PP & on the first or second cycle at Dumbo.
