Half of Ripsaw Falls bridge....

h20jag

<br><font color=green>DIS Veteran<br><font color=m
Joined
Dec 18, 2000
Messages
1,073
...was partitioned off last Saturday. Anyone know if it's maintenance or something being added?
Jim
 
Just routine maintenance.

There was a number of problems with the old surface of the bridge. Colors were bad - plus the biggest problem was the strength of the old surface. In fact, the old surface was cracking and falling to pieces.

So, the Toon Bridge is getting a new surfacing. Just like the highway department does to road bridges. The concrete was removed down to the supports, and a new surface has been poured - which looks ALOT better and will last much longer than the old one.

The whole bridge should be back open in the next few days.
 
You have nailed it. The Toon Bridge project wrapped up last night. Surface work is done and the fence is down, bridge is fully open as of this morning.
 












Receive up to $1,000 in Onboard Credit and a Gift Basket!
That’s right — when you book your Disney Cruise with Dreams Unlimited Travel, you’ll receive incredible shipboard credits to spend during your vacation!
CLICK HERE







New Posts







DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter DIS Bluesky

Back
Top