Here are some previous dates: (LD = Labor Day)
2008: LD 9/1,
2007: LD 9/3, Overlay install: 9/4 (Tu) to 9/20 (Th), HMH opened 9/21 (Fri)
2006: LD 9/4, Overlay install: 9/11 (M) to 9/28 (Th), HMH opened 9/29 (Fri)
2005: LD 9/5, Overlay install: 9/12 (M) to 9/29 (Th), HMH opened 9/30 (Fri)
2004: LD 9/6, Overlay install: 9/7 (Tu) to 10/1 (Fri), HMH opened 10/2 (Sat)
2003: LD 9/1, Overlay install: 9/8 (M) to 10/2 (Th), HMH opened 10/3 (Fri)
HTH