sdk1231
DIS Veteran
- Joined
- Dec 8, 2017
- Messages
- 884
Updates... so, I'm hearing the following: Building 8 completely flooded (I'm 90% sure that's Boca Chica), Building 5 leaking from the sprinkler heads (that's Sago). Leaking in the main building lobby. RPC rooms w/some flooding due to water coming in the balcony doors... lots of sopping wet towels. Unconfirmed, but hearing that the roof lifted at Building 2 at at the Poly. Heard of a tree downed at Port Orleans, taking out a laundry building.