I just went through this... walked through the kitchen one morning to find water coming up through the laminate flooring. Fridge had been leaking between the planks and flowing over the slab and wicked up the walls for at least a week before discovery. After 6 days (Memorial Day Weekend) with cut out walls and industrial fans the adjust came out and said the entire first floor would have to be re-floored (1,200 sf), all new paint, all new floorboards, all new kitchen cabinets, counters, laundry room. It was a complete unplanned remodel. I ended up installing tile that looks like walnut hardwood. Including the cost of the new fridge, I was out of pocket about $2k on a $23k plus job.