I think they mean this case that included studies from industrial engineers:
https://casetext.com/case/al-v-walt-disney-parks-resorts-us-inc-1
“Mr. Laval, as well as a current Disney industrial engineer, testified about a "Tester Study" in which testers used certain ride passes—DAS, FastPasses, or readmission passes—to experience as many attractions as possible during a three-day period. The results showed that testers with DAS experienced, on average, 45% more attractions than those without DAS. On one of the days, the non-DAS testers waited in queues on average a total of 255 minutes or more than 4 hours, whereas the DAS testers only waited in line on average total of 107 minutes, or just under two hours. As a result, Mr. Laval concluded that the Tester Study showed that guests with a DAS can experience more rides and attractions—as the evidence showed, at least 4 or 5—with much less waiting than guests who do not have a DAS card.”
“The Disney Industrial Engineering team performed an "incremental analysis" study in 2015 which highlights the impact on wait times for the vast majority of guests at the Disney parks. The team measured the impact on wait times if every guest with a DAS pass were given one to three readmission passes, as well as the impact if the percentage of guests with DAS passes were to increase by one or two percent. As more guests enter the FastPass line, the standby line will be slowed as more guests from the FastPass line are put onto the ride to keep that line moving quickly, since guests wait times are limited to around 15 minutes or less in the FastPass line. The "incremental analysis" study showed that the wait times increased significantly for all guests across the board when guests with DAS were given one or more readmission passes. Specifically, if every DAS guest were given two more readmission passes, the standby wait time at the popular Seven Dwarfs Mine Train ride would increase by 39 minutes, from 69 to 108 minutes. The wait times would also increase more significantly if the percentage of guests with a DAS increased, a scenario Disney anticipated as more guests learned about the increased benefits, based on similar problems and abuses that developed with the GAC program. Thus, for example, if all DAS guests were given two readmission passes for their party, a 1 % increase in daily DAS users would cause the standby wait time at Seven Dwarfs Mine train to increase by nearly an hour, from 69 minutes to 124 minutes. Similarly, there were significant increases in wait time for the other popular rides the industrial engineering team studied.”
This is so important. All of these people saying the DAS abuse doesn't impact other guests needs to read this. It does. Good on Disney for addressing this issue that has a major impact on the guest experience!