Yikes!! We have reservations there for December 17th, and requested a top floor villa. Hope we don't regret making that request. Now I have that to worry about along with everything else.
they (owners - a couple of the board) said on tug - that no one is going on the top floor. (if they are working on that building).
It is definitely taking alot longer than they though. the construction people have been working on 8 for a month now.
I think they though it would mostly be done by now.
www.tug2.net - you don't have to join to read or ask posts - just sign up and log into their
bbs.
boy I know the feeling - I have a 3-bedroom - well at OKW all the 3-bedroom are on 2nd and 3rd floors. but I have told that CP doesn't work that way.
taking off the roof is the most noise. but since they the new roof is so far behind - they have stopped this. (there are 4 building without roofs waiting for the new one - before they stopped taking off the roofs)
We stayed at CP last weekend for 2 nights and for 2 nights on the 26th and 27th of Oct. we were actually in a building which was getting re-roofed but they only work from 10AM to 6PM daily and it really wasn't a problem as most times during the day we weren't there.