dbs1228
DIS Veteran
- Joined
- Feb 24, 2010
- Messages
- 2,164
Has this happened to anyone we closed on SSR 160 point contract on 4/1 and I kept checking my dvc account and was excited today that the points were there but it shows 2009 150 banked out points (was suppose to be 160) 2010 allotment 160 available 150, and it says the same thing for 2011 and 2012. I had a points activity report run the day before closing it it said all 160 banked and current points were there. I am assuming this is a dvc error hopefully easily corrected since I want to book a ressie tomorrow?