Haha, definitely very hopeful. I think we enjoy doing it because it gets us excited about these things too!
On that note, here is my pool update..a bit late..but still here. Pictures first:
Kiddie area, complete and ready to go, only waiting on the fencing to be finished
Perspective on huge size of pool/deck
The fortress with new slide
More kiddie
A blurry pic
One of the pool deck entrances
The old fortress, repainted and ready to go (staircase on the left leads to the smaller slide) and supposedly the cannons will be working
Another blurry one
Between the old fortresses to the new one!
Closer shot of the slide
"15" person hot tub and shallow end of the pool
Zero-depth entry and more new fortress
More old fortress
A pretty one
A really terrible shot of the old slide, still in place
Okay here's the general update. Pool opening remains somewhere around
September 6th/7th, I think the 8th at the latest. As stated before there are two hot tubs supposedly able to hold 15 people each, looks closer to 10 or so. The cannons on the old fortress are said to be working again (haven't seen this with my own two eyes yet). The kiddie area is complete. The bathroom buildings are one of the final things needing to be finished. (The new bathrooms are huge in case anyone was interested). I believe there is also a companion restroom. There will be a handicapped lift on the pool deck. Three lifeguards will initially guard the pool. The slide is equipped with a red light/green light system so children hopefully don't go down on top of each other.
That's all I can think of for now. Any other questions feel free to ask and I'll either have an answer or find an answer.
For anyone interested these pictures were taken just before sunrise this morning (8/29) so the lighting is a bit odd. I apologize for some of the blurry pictures.
Enjoy!