ton80
Red Dot stuck in a Blue State !
- Joined
- Mar 26, 2005
- Messages
- 590
Hi,
I have 2 contracts, 1 is for SSR with an Oct UY, which currently has 150 pts for 2014 ( already used 2013 allotment). The 2nd contract is for 50 pts @ OKW with a UY of AUG ( Currently 50 available for 2013). How would i be able to book at the 7 month window for BCV for June 2014 assuming I would need 200 points total?
I have 2 contracts, 1 is for SSR with an Oct UY, which currently has 150 pts for 2014 ( already used 2013 allotment). The 2nd contract is for 50 pts @ OKW with a UY of AUG ( Currently 50 available for 2013). How would i be able to book at the 7 month window for BCV for June 2014 assuming I would need 200 points total?

Bill