LisaR
<img src=http://www.wdwinfo.com/images/silver.jpg>
- Joined
- Sep 26, 2000
- Messages
- 9,932
My husband is remodeling our bathroom. His greatest fear is that he didn't pitch the shower floor correctly. That was one of the many reasons why we had to remodel the shower in the first place because the builder did a crappy job.
The floor leveler has been dry for 48 hours. He is ready to lay the tiles. He would like to turn the shower on before laying the towels and make sure it drains properly first. We can't find in info on whether or not the floor leveler can get wet. Obviously, if he did this, we would let it dry out for a couple days before laying tile. Anyone know if we can do this? Thanks!
The floor leveler has been dry for 48 hours. He is ready to lay the tiles. He would like to turn the shower on before laying the towels and make sure it drains properly first. We can't find in info on whether or not the floor leveler can get wet. Obviously, if he did this, we would let it dry out for a couple days before laying tile. Anyone know if we can do this? Thanks!