I found these timelines very useful while going through the purchasing cycle that I hope this helps any newbies out. I will update this thread once all pieces are complete.
June 6-made offer on a 250 point Boardwalk contract
June 7- seller countered
June 7- I accept, inventory of Boardwalk was non existent for what I wanted
June 11- I send signed contracts back
June 15- Seller returns contract
June 15-Sent to ROFR
July 10-Pass ROFR
July 19-Receive closing docs sent back next day overnight, seller alittle slower
July 27-Closed
July 30-We show up on Orange County Website completed
Aug 2- points loaded, online access complete
Aug 13- received membership cards in the mail
Jaime
June 6-made offer on a 250 point Boardwalk contract
June 7- seller countered
June 7- I accept, inventory of Boardwalk was non existent for what I wanted
June 11- I send signed contracts back
June 15- Seller returns contract
June 15-Sent to ROFR
July 10-Pass ROFR
July 19-Receive closing docs sent back next day overnight, seller alittle slower
July 27-Closed
July 30-We show up on Orange County Website completed
Aug 2- points loaded, online access complete
Aug 13- received membership cards in the mail
Jaime