cpayne1997 said:I just left CR yesterday and spoke to a nice lady at the front desk about this same subject. I was told that the north wing would be turned into DVC. I did not ask if they would be using the stucture that is already onsite or if they would tear down and rebuild. I was also told that they could not start on this until the south wing was done. Also was told that it takes about 2 weeks to refurbish 1/2 of a floor in the tower. As of yesterday they were about to reopen bayside floor #9. The rooms on the 10th were done and they looked GREAT!!!![]()
So 10th is done, 9th 1/2 way, and then I guess the other 1/2 of 9th? What floor after that? 2 Wks per 1/2 floor? I read this rehab was suppose to of started in July? So they only have 1 1/2 floors done?