I believe that the first aircraft with the IFE should be in service by the end of the month to keep with the advertised, October timeframe. The rest will be rolled out 1-by-1 through the first quarter of 2004. If you're flying in January, you may or may not be on a flight with the tv's as there may only be a handful of aircraft with them installed.