I have never made ADR's before and have a little bit of time before I can. We are going to be at WDW from Nov 24th - 30th.... So if I want to make ADR's for the 24th I call 180 days out and then I have to call each day after that to make my ADRs?
Like I call to make the 24th ADR then I call the next day to make ADR's for the 25th? and so on?
How does it work? I want to make sure I have it all under control before it is time to make my ADR's.
TY
Like I call to make the 24th ADR then I call the next day to make ADR's for the 25th? and so on?
How does it work? I want to make sure I have it all under control before it is time to make my ADR's.
TY