No idea, I'd guess a few months at least.Any idea how long these products will be stocked? We will be there JanFeb 2017.
No idea, I'd guess a few months at least.Any idea how long these products will be stocked? We will be there JanFeb 2017.
Any idea how long these products will be stocked? We will be there JanFeb 2017.
Interesting. I don't think the ride is currently on any refurb calendars.Notice of Commencement for work on Rock-n-Roller Coaster by Buena Vista Construction Company to "provide labor, material and/or electrical for construction." No expiration date specified, therefore a default expiration of July 16, 2017.
Interesting. I don't think the ride is currently on any refurb calendars.
Makes sense.When the expiration date is left blank it does default to one year, but this normally means that it's a very short duration, and considering that this is BVCC it's probably something minor.
Rumor
As part of the pending Epcot changes. Electric Umbrella is gone. A replacement for it is likely but maybe not in the exact same spot. Also expect more green around that area of the park. Future world might even get a name change.
News
First look inside Abracadabar
https://disneyparks.disney.go.com/b...look-inside-abracadabar-at-disneys-boardwalk/
I hope not I like it never having a wait. It's a must do for me on my trips.NEWS
I see Living with the Land moving to Tier 2 FastPass+
Interesting that this ride never has a wait, except every once in a while gets a surge of people. Will switching it to FP+ Tier 2 actually lead to their being a bit of a wait?
NEWS
I see Living with the Land moving to Tier 2 FastPass+
Interesting that this ride never has a wait, except every once in a while gets a surge of people. Will switching it to FP+ Tier 2 actually lead to their being a bit of a wait?
Rumor
As part of the pending Epcot changes. Electric Umbrella is gone. A replacement for it is likely but maybe not in the exact same spot. Also expect more green around that area of the park. Future world might even get a name change.