Anyway, I asked him about the construction. As of now, they haven't begun construction on the 6th floor. They are expected to start in June (very soon). The 6th fl will be totally "off limits" during our mid-Aug stay. The Concierge rooms will be on the 4th floor, all with Savannah views. They will no longer have Pool view rooms. (Double YEAH!) The 4th fl will have both Concierge and non-concierge rooms.
For now, the lounge will remain on the 6th floor. However, they may have some of the services on the 3rd floor (like breakfast). This is still "up in the air". He wouldn't say for sure, but it sounds like they will be relocated the lounge. (Makes sense, it s/be on the same floor as the rooms.) They want to have all the construction around the lobby area finished by the Christmas season.
Also, the breakfast after the Sunrise Safari will be relocated mid-August when Tusker (I believe that is the name) is closed for renovation. They aren't sure where the b/fast will occur. It may be in AK, or they may bring everyone back to Boma.
So, a lot is "up in the air". Other changes may occur as they get further into the project. However, the staff is dedicated to making sure we all have a wonderful time and aren't impacted by the changes occuring.
Anyway, I asked him about the construction. As of now, they haven't begun construction on the 6th floor. They are expected to start in June (very soon). The 6th fl will be totally "off limits" during our mid-Aug stay. The Concierge rooms will be on the 4th floor, all with Savannah views. They will no longer have Pool view rooms. (Double YEAH!) The 4th fl will have both Concierge and non-concierge rooms.
For now, the lounge will remain on the 6th floor. However, they may have some of the services on the 3rd floor (like breakfast). This is still "up in the air". He wouldn't say for sure, but it sounds like they will be relocated the lounge. (Makes sense, it s/be on the same floor as the rooms.) They want to have all the construction around the lobby area finished by the Christmas season.
Also, the breakfast after the Sunrise Safari will be relocated mid-August when Tusker (I believe that is the name) is closed for renovation. They aren't sure where the b/fast will occur. It may be in AK, or they may bring everyone back to Boma.
So, a lot is "up in the air". Other changes may occur as they get further into the project. However, the staff is dedicated to making sure we all have a wonderful time and aren't impacted by the changes occuring.