There is a thread over on the DVC board speculating about the main pool at OKW being converted to a zero depth entry style pool while the slide addition is being built. Seems like a small window to complete such a project so I was curious if anyone remembers how long the Poly and GF pools were closed for to add the zero depth feature?
(I apologize if I'm wrong, but I think this was the case? Poly and GF that is.)
There is a thread over on the DVC board speculating about the main pool at OKW being converted to a zero depth entry style pool while the slide addition is being built. Seems like a small window to complete such a project so I was curious if anyone remembers how long the Poly and GF pools were closed for to add the zero depth feature?