In early February, the swing bridge looked complete, but the area between it and the MK entrance was completely torn up as they were removing the paving stones and it looked like they were re-terracing the slope up to the monorail, too. On both sides, there was no "approach" to the bridge, to bring the height of the walkway up to the height of the bridge.
With the halt of all construction projects, I wouldn't count on this being opened until late in 2020.