Cool! Between this and development on the other side of SSE, it'll be a bit more of a Main Street.
Sounds like just adding touch points. So making the entrance a bit bigger by taking out that planter. Nothing drastic but will be needed.I've said from day one that even though no one knew of any planned changes to the IG that it never meant there were none coming. Disney does manage to do somethings without anyone knowing in advance. That it would just about have to have something done to it once the skyliner opened. Will be interesting to see what they come up with
Something is better than nothing, even it's only a small something.Sounds like just adding touch points. So making the entrance a bit bigger by taking out that planter. Nothing drastic but will be needed.
I've said from day one that even though no one knew of any planned changes to the IG that it never meant there were none coming.
Permit filed for Epcot entrance project today. Defaults to 1 year and is from Whitting Turner.
No it expires in one year so from filing date they have 1 year to finish the project unless they file an extension.What does default to 1 year mean? It starts in 1 year?
![]()
No it expires in one year so from filing date they have 1 year to finish the project unless they file an extension.
Not usually.thanks! Ha, they must file a lot of extensions!![]()
As rteetz said they don't have to have many extensions because there are multiple permits reach project. One may be for excavation, one for foundations, one for steelwork etc., there's not just one for the entire ride/bldg.thanks! Ha, they must file a lot of extensions!![]()
Ok, I did a quick glance and if it's here and I've missed it, I'm sorry. We've been at BWI for so many trips in a row now I realized last weekend it's been a long time since I'd been out the front of the park so I have no idea how long the walls have been up around the security/monorail exit area. What's going on with the construction out front? Are they finally fixing something with the way you come off the monorail and going through security? Something else?
Not sure current status or if this is still the same work area that you saw, but they had walls up back in December here in an area roughly around the monorail exit. I think there were also some other walls up in the general monorail station area if I’m not mistaken. I of course will be a very happy camper if and/or when this were to ever lead to a direct entrance path from the monorail to avoid the double screening.
View attachment 383576
Yeah, those are the same general walls we saw and they were still in the same state on Saturday. Their being in that location is exactly why I had thoughts that maybe, just maybe they were trying to do something to reorganize placement of screening areas so that those coming down off the monorail ramp would be inside security. No clue if it's going to be possible with the way the walls are placed but maybe.
I heard something about this permit being filed along with Club Cool being demolished (among other things). This is one of our favorite spots - will Club Cool be around this November?Permit filed for Epcot entrance project today. Defaults to 1 year and is from Whitting Turner.