kes601
DIS Veteran
- Joined
- Oct 29, 2018
- Messages
- 2,708
Thought I’d share our experience from this past weekend. We arrived at BWV on Wednesday afternoon and left early yesterday morning. We were on the 3rd floor facing the main pool, just above Leaping Libations (a great room for our 10th anniversary).
At any rate, you could certainly see that construction was going on because of the scaffolding setup outside and one hallway closed off per floor, but we didn’t hear any construction from our room. It was better than I had anticipated.
The only issue we had, which I don’t know if it was construction related or not, but our water pressure in the shower dropped significantly on Saturday and Sunday morning. The water was also not nearly as warm.
At any rate, you could certainly see that construction was going on because of the scaffolding setup outside and one hallway closed off per floor, but we didn’t hear any construction from our room. It was better than I had anticipated.
The only issue we had, which I don’t know if it was construction related or not, but our water pressure in the shower dropped significantly on Saturday and Sunday morning. The water was also not nearly as warm.