n2mm
aka WALTSGIRL
- Joined
- Oct 9, 2000
- Messages
- 23,289
Got here on 9/9 and here for 12 nights. The refurb is crazy busy. So much activity. When you get off the elevator every floor to the left (bw view side) are completely closed off. Sitting at the quiet pool watching carts full of beds, towel racks, TVs, etc go by continuously. Plus there’s painting going on on the outside with lifts parked in the center front green space. Scaffolding going up and workers everywhere. Obviously it’s not quiet, and at times there are detours to get around outside. Since they are moving so quickly this first week, I hope that’s good news. It’s weird to have part of the resort shutdown. The pools have been very empty most of the days. More crowded in the evening. They had the tunnel near the main pool closed and you had to weave throughout the inside building to get to the other side. Pack your patience if you’re heading here soon. We have another trip late October, 9 nights. cant wait to see the finished product. Heading to HH next weekend 9/22 so hoping to see some refurb progress there too.