BCV Studios avaialbe for Feb/Mar

plutofreak

See you in a month Mickey!!
Joined
Sep 14, 2004
Messages
223
Just letting everyone know BCV has opened up for studios for Feb/March. I have been checking constantly and was able to switch from OKW. Hope this helps someone. I'm assuming the reno's are done?
 
If you mean refurbishments at BCV, no they most likely won't be done by then. They just started on a 20 month refurb of the entire Beach Club resort and BCV was mentioned as getting attention after the hotel side is done. Actually a lot of people are switching from BCV to other resorts to avoid the coming construction and noise.

Good score on getting BCV though!
 




















DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter DIS Bluesky

Back
Top Bottom