bama_ed
It's kind of fun to do the impossible-Walt Disney
- Joined
- Sep 23, 2004
- Messages
- 13,530
This first phase of documents being released is all the boilerplate contract language for the Trust, etc. but it also "declares" the first batch of cabins going into the trust. They are labelled in the documents as "Phases 1A, 1B, 1C, 1D, 1E, 1F, 1G, 1H, and 23".
If you look at the first graphic in post #77, you see that the dashed lines section off these various phases 1A-1H for Loop 23. For example, Phase 1A is cabins 2301, 2303, 2305, 2307. Phase 1B across the road is 2302, 2304, 2306, 2308. All the other "Phase 1x" fill up Loop 2300. The master map of all 8 cabin loops has dashed lines for multiple Phases 2x-22x. I've squinted at them and wrote them down but they're not all consecutive like Loop 2300.
Loop 2500, for example, has Phases 2A, 2B, 13A, 13B, and 21A. So who knows if they will convert loop-by-loop or all the 21's for example. But each declaration will tell us the next "batch" of phases/cabins/loops being done.
Finally, the Phase 23 mentioned at the start of this post is the pool/laundry building area in the cabin loops. Which probably needs an early start.
Here is the "Cabins Declaration of Covenants, Conditions, and Restrictions" PDF document that has been filed with Orange County. Phases affected are listed on page 7 of the PDF (section 3.1), overall CFW map on page 40, Loop 23 Phases 1x closeup on page 45, the floorplans on page 47, and the pool closeup Phase 23 on page 49.
H/T to @kneely58 for posting this PDF on the DVC board thread.
https://www.disboards.com/threads/ft-wilderness-cabins-becoming-dvc.3916819/page-71
It's in post #1401.
Ed
PS - oh I read in there somewhere that "up to" 35% of CFW can be sold as "Fixed Use Periods". So you could buy the week of Christmas-New Years or Halloween or whatever and go every year at that time.
If you look at the first graphic in post #77, you see that the dashed lines section off these various phases 1A-1H for Loop 23. For example, Phase 1A is cabins 2301, 2303, 2305, 2307. Phase 1B across the road is 2302, 2304, 2306, 2308. All the other "Phase 1x" fill up Loop 2300. The master map of all 8 cabin loops has dashed lines for multiple Phases 2x-22x. I've squinted at them and wrote them down but they're not all consecutive like Loop 2300.
Loop 2500, for example, has Phases 2A, 2B, 13A, 13B, and 21A. So who knows if they will convert loop-by-loop or all the 21's for example. But each declaration will tell us the next "batch" of phases/cabins/loops being done.
Finally, the Phase 23 mentioned at the start of this post is the pool/laundry building area in the cabin loops. Which probably needs an early start.
Here is the "Cabins Declaration of Covenants, Conditions, and Restrictions" PDF document that has been filed with Orange County. Phases affected are listed on page 7 of the PDF (section 3.1), overall CFW map on page 40, Loop 23 Phases 1x closeup on page 45, the floorplans on page 47, and the pool closeup Phase 23 on page 49.
H/T to @kneely58 for posting this PDF on the DVC board thread.

https://www.disboards.com/threads/ft-wilderness-cabins-becoming-dvc.3916819/page-71
It's in post #1401.
Ed
PS - oh I read in there somewhere that "up to" 35% of CFW can be sold as "Fixed Use Periods". So you could buy the week of Christmas-New Years or Halloween or whatever and go every year at that time.
Attachments
Last edited: