My crew and i have been waiting on 1 yard of concrete to be delivered since 9:30 this morning. Forms are set, rebar in place, wheel barrow at the ready,,, all the tools stretched out waiting on mud,, ,and we wont be able to get a truck before 12 45 to 1 pm. and people wonder why thier projects get delayed and go over on price. yesterday i waited around till after 5 pm on a gravel delivery, today we are waiting around on concrete, who knows what tommorrows delay will b e. all this time,, for a 16 ft long three ft wide sidewalk, that i could have had floated out and finished by now had we got mud at 10 am as planned.
 
I thought you were going to blame it on the Lush-ious Ladies. :teeth:
 
SherryNC said:
I thought you were going to blame it on the Lush-ious Ladies. :teeth:

Me too, thought he overslept after driving the bus all night.
 
Aidensmom said:
Me too, thought he overslept after driving the bus all night.
Lucious ladies. lushous ladies. it isn't our fault:)
 

nope concrete plant forgot that i had a small pour schedualled and sent all trucks on a big run about 45 min away, at 11 45 the truck was just leaving hte site,, i'm next,, but waiting on acobncrete truck and driver to return to town, eat lunch load out my concrete and then deliver,., i may get mud on the ground by 1 45 or 2,, that means it'll be 6 or 7 before i can leave it for the night.
 
FroggyinArk said:
nope concrete plant forgot that i had a small pour schedualled and sent all trucks on a big run about 45 min away, at 11 45 the truck was just leaving hte site,, i'm next,, but waiting on acobncrete truck and driver to return to town, eat lunch load out my concrete and then deliver,., i may get mud on the ground by 1 45 or 2,, that means it'll be 6 or 7 before i can leave it for the night.
That stinks. Do you need a drink?;)
 
darn i'm good,, mud was delivered at 1 45,, ( good guess huh:)) and we walked away from it at 330. not a bad pour went smooth, dryed to finish faster than i thought, ( was scared the humidity would be up and slow dry time, but was perfect,, all we like now is clean up and breaking the forms tommorrow.
 
Welcome back! I am glad the mud thing went well :banana:
I love it when a plan comes together! ;)
 
Yeah, I like a man with confidence. ;)
 
yup one 3 x 16 ft patch is now in place across customers patio:)
 


Disney Vacation Planning. Free. Done for You.
Our Authorized Disney Vacation Planners are here to provide personalized, expert advice, answer every question, and uncover the best discounts. Let Dreams Unlimited Travel take care of all the details, so you can sit back, relax, and enjoy a stress-free vacation.
Start Your Disney Vacation
Disney EarMarked Producer






DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter

Add as a preferred source on Google

Back
Top Bottom