2019 DVC Condominium Association Meeting

Refurb Schedule:
2020 - Aulani (Minor Refurb)
2020 - Boulder Ridge (Full Refurb)
2021 - Grand Floridian (Minor Refurb)
2022 - Hilton Head (Full Refurb)
2022 - Polynesian (Minor Refurb)
2022 - Beach Club (Minor Refurb)
I hope the HHI refurb makes it so that when the air circulator turns on, it doesn’t sound like someone’s walking into the room.
 
Did the refurb schedule change? I recall VWL/BRV being scheduled for 2021. Does anyone know if the capital reserve budget reflects part of the big bump in ADs at BRV?
 















New Posts





DIS Facebook DIS youtube DIS Instagram DIS Pinterest

Back
Top