wait, am i reading this correctly? Test Track is being worked on? So no test track when i go there Nov 25???
No, TT will not be running Nov. 25th.
As for soft openings, as I understand it, the staff for that area have been told they'll continue be scheduled in other areas during that soft opening window. While it'd be surprising to have no test audiences go through, a full fledged soft opening is looking less and less likely, and if there is one, it would be almost at the time of opening.
That said, TT is still massively behind. There are major features that simply aren't working. I know they're working almost 24/7 to get it up, but at this point they had anticipated to be much, much further along then they are. As it is, it's looking less and less likely that these wonder cars that their sponsor wanted as some sort of interactive display at the end of the ride will be installed before the ride opens, requiring another short downtime sometime in the spring, or reduced ride hours for a period of time, if not a total change of plans again.
They'd initially hoped that TT would be opening 18 days ago after the big refurb, but so many problems and setbacks will make even the 6th a struggle. I don't even think they'll make their goal of having the outside of the building done and relandscaped by Nov 1st.