Does anyone know if they are still renovating POP after the 70's building? What building is next? Does anyone know when the renovation will be done?
I don't know. The rooms look more than spruced up to me. I was in a non refurb room in Jan. that I didn't enjoy at all because it was old and dirty. These new refurb rooms look SO much better. It would make a huge difference to me if I was staying there if I got a refurb room or not.
I've heard they are trying to get it done in 12 weeks, but I don't know what building next or in what order.
I don't know. The rooms look more than spruced up to me. I was in a non refurb room in Jan. that I didn't enjoy at all because it was old and dirty. These new refurb rooms look SO much better. It would make a huge difference to me if I was staying there if I got a refurb room or not.
I've heard they are trying to get it done in 12 weeks, but I don't know what building next or in what order.
Does anyone know if they are still renovating POP after the 70's building? What building is next? Does anyone know when the renovation will be done?
So which buildings have been spruced up so far?
More accurately, it's expected to take twelve weeks; yes, there's a difference between that and 'trying to get it done in' twelve weeks. The latter implies a possibility (not likelihood, but possibility) of cutting corners toward the end if they run behind schedule.williamson_ja said:I've heard they are trying to get it done in 12 weeks, but I don't know what building next or in what order.
The 70's building !
go here http://allears.net/acc/g_pop.htm, scroll all the way down until you see 70's building new pix!
More accurately, it's expected to take twelve weeks; yes, there's a difference between that and 'trying to get it done in' twelve weeks. The latter implies a possibility (not likelihood, but possibility) of cutting corners toward the end if they run behind schedule.
And to answer the OP: yes, they will be moving on to other buildings after the 70's are done, if they haven't already; and nobody's posted which building is next as far as I know; and, as above, ideally twelve weeks but if it takes longer, it takes longer.