wifey
DIS Veteran
- Joined
- May 7, 2005
The work here today is very noisy, I kinda feel for the guys working on the roof it's been baking hot the last few days. Lots of power sawing drilling hammering and the like up on the roof today but it's necessary since it needs maintenance regularly just like any home believe me when it leaks in here it really does pour in through the building. Thankfully we are at the end of our stay and it has not inconvenienced us, definitely glad we didn't request a standard view room in the south wing over the Mercantile and the games room since that's where most of the work is ongoing. No ground breaking for Octobers construction though.
We got soaked yesterday after riding Kali River Rapids the heavens opened and it was like a monsoon there full thunder and lightning and everything flooded for 40 minutes standing water of 3-4 inches in places but the bus service back to the resort was on time and wonderfully quick. Could have done without the AC on full blast...you girls know what I mean
We got soaked yesterday after riding Kali River Rapids the heavens opened and it was like a monsoon there full thunder and lightning and everything flooded for 40 minutes standing water of 3-4 inches in places but the bus service back to the resort was on time and wonderfully quick. Could have done without the AC on full blast...you girls know what I mean