Ok, I am going to try and make this as simple as possible. Just got a callback from a VIPassholder specialist. Quick recap on my current ap situation
I had a Gold AP that expired May 14th I called back then and was told to renew just so I could have the pass active but that I would get my number of days back (March 16-May14) for Gold once the parks reopened. I renewed my AP and my kids as Silver since Gold extension would cover me through the blackout dates in the Summer (Jun-Jul-Aug) and I would pay less with Silver (I thought I was so smart) I called again just to make sure this would be the case and was told I would not have a problem
Well today during the call I expressed my fears and sure enough since I renewed the AP that is currently showing is Silver and I would get 4 months (March 16 to July 11) with the blockout dates for Summer, technically I wouldn't be able to book reservations because of this
I also asked him about the last payment in April, I'm on the monthly program and they froze that, he said I will not see payment for that one needed and will just start getting charged for my Silver once it reopens for 12 months
So I was getting a bit worried but then he reassured me that once the system is in place and they all go back to their offices he will be able to open up ability for me to book in July since it was a mistake on the other CMs.
He did say he didn't know when the info for AP will be available and that it may come out "very close" to opening day (July 15th)
He told me they were having weekly meetings on this and that those meetings are very "hectic and interesting"
He sent me an email with what we talked about and again reassured me I can shoot him an email when I start seeing changes on
MDE about extensions or if anything about the reservation system is released
He did mention talks about freezing the extensions until after the reservation system is over but that they haven't reached any type of decision on that
So he basically said that I shouldn't have renewed back then