BlueFairy
DIS Veteran
- Joined
- Aug 19, 1999
- Messages
- 2,462
The Dolphin is being renovated in sections. The entire West Wing was shut down when we were there in late June, for the renovation, which made for a nice stay since that really cut into the number of guests using the hotel. Many of the rooms had ladders and tools inside, and some were covered in plastic, that you could see through the windows from Fresh. They did not say which section was going to be next. It was not a top to bottom thing, as it was the entire West Wing out of service, and there were no lights on at night on any of the floors (as there would be with guests present).
Well if that is the case one could assume that the triangle (upper floors) are done based on what I recall hearing when we were making our request in March. I'm sure they told me all the upper floors were finished. We were on 11 over the fountains.