How about opening day of the new Soarin’. It’s crazy that we were done by 20 minutes after park opening. It was our last day and we couldn’t get a FP so what the heck. But about right here I thought we had lost our minds.
Show me the loading area for a ride vehicle.
Edit - forgot to change the photo so Disboards wouldn’t load it upside down.