There is SO MUCH construction! I nearly pulled my hair out! There was about a 10 mile stretch in SC where they were painting the lines and only the left land was open. Half the cones were down, which made it very treacherous, especially in the dark on the rain(yes they were still working) Then I-95South was closed in Jacksonville. They had these tiny little signs showing you where to detour. WTH? This is a major highway. Anyway,the detour ended up being I10 West, then exit at Lenox and follow signs to I10 East to 95 South. Lots of construction between Jacksonville and Orlando as well, with the concrete barricades. Let's just say that between the construction, the storms and the big rigs, a trip that should have taken 9 hours took 10 1/2!