Pop Century Refurbishments - March 2025 - February 2026 - Information and Discussions

Anyone know if building 3 is done? It just so happens that it's the building I want to request for late July (22nd-27th) However doesn't look good if they are on building 2. I'll look for a backup option
We have not had any reports that building 3 has even been started so I would be surprised if it is complete. To date we have had reports of the following:
- Building 1 - complete
- Building 2 - in progress
- Building 5 - in progress

If anyone is there and has updates on the above, I'd greatly appreciate it and can update the first post.
 
We’re looking for guests who have recently stayed at Pop!! Which building/room were you in and was it refurbished?

Easiest way to tell if you were in a refurbished room is the floor. Was it all brown or, did it have flooring inlaid that looked like a carpet?

Thanks so much!!
 
Stayed at Pop last weekend, building 6, not refurbed and no construction taking place on that building. No construction was taking place on that side of the property, from what I saw. I didn’t venture to the other side.
 

/
I just checked out. The 2 buildings considered hippy dippy Pool View are being worked on. All the windows have Notices Posted and some windows are covered.
Not sure the Building number but they are to your right as you leave check-in and would be considered the laundry room side of pool.
We were across from them . I was worried about a long wait for our room to be ready but it wasn’t too bad.
Very busy this past weekend! But always Fun .

Wish I was still there. I enjoyed the new Coffee Shop a lot !

I guess the room we were in has not been refurbed yet because it still had original flooring .
 
Last edited:
I just checked out. The 2 buildings considered hippy dippy Pool View are being worked on. All the windows have Notices Posted and some windows are covered.
Not sure the Building number but they are to your right as you leave check-in and would be considered the laundry room side of pool.
We were across from them . I was worried about a long wait for our room to be ready but it wasn’t too bad.
Very busy this past weekend! But always Fun .

Wish I was still there. I enjoyed the new Coffee Shop a lot !
Thank you! You have confirmed that building 4 is under construction. Appreciate the update!!
 
Actually two buildings are being worked on at the same time.
Not sure if it included the back sides but both of the front preferred pool views have Window Notices posted. And are blocked off for construction workers only.
 
Actually two buildings are being worked on at the same time.
Not sure if it included the back sides but both of the front preferred pool views have Window Notices posted. And are blocked off for construction workers only.
Thank you!! I will update post - to indicate building 5 is also under construction. So helpful to know!!
 

PixFuture Display Ad Tag












Receive up to $1,000 in Onboard Credit and a Gift Basket!
That’s right — when you book your Disney Cruise with Dreams Unlimited Travel, you’ll receive incredible shipboard credits to spend during your vacation!
CLICK HERE














DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter

Back
Top