OKW Refurb...buildings done by Jan 2011?

postesf

Keep Pushing
Joined
Jul 18, 2007
Messages
2,712
Hello. I've seen some pics folks have posted of the refubed rooms and which bldgs have been done so far...

We are going in January 2011 through RCI(2 bedroom!!!) and would really like to stay in bld. 26 or 62 and I was wondering if those or the ones around them would be done by then...

Ideas?

Thanks!
Stacie
 
anyone? I guess I can call as we get closer to going. I just wonder how many calls they get about this...
 
Those buildings will be some of the last completed, as they started the rehab in the 30s buildings.

As far as being able to select a specific building, it depends entirely upon which booking category your RCI trade is in. Building 11 to 14 and 23 to 26 are in the Near Hospitality booking category, if your RCI trade is not in that category, you will not be assigned one of those buildings.

Building 62 to 64 are the only buildings with elevators, and they are often held for those with mobility issues that don't necessarily need a handicapped modified unit, though there are a few modified units in bldg 63.
 











DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter

Add as a preferred source on Google

Back
Top Bottom