ILoveMyDVC
DIS Veteran
- Joined
- Aug 24, 2000
- Messages
- 3,063
Thank you for the info! The million dollar question for me -is what is next - as we head down in August.
The original beds in the Studios were wood frame with box springs and mattress, then with the last refurbishment, they went to the sealed frame under the bed, and now they are back to a wood frame, with no box springs. And while comfortable, I was always bruising myself on the corners of the original beds. Probably will do the same with these.
Looks more like the Contemporary. They kept that gawdawful coffee table and the painted dining room table. And the chairs for the table are the same. I thought this was a 100% renovation? Tub looks the same. Laundry room is the same. Sofa looks awful.
I'm in Bldg 35 right now in a studio and the chairs are identical.
Another "unofficial" rehab report.
Just got back and we had engineering in to fix the sofa bed, one worked on some of the rehab so we asked a few questions:
He wasn't sure about the kitchen table and had no info on theme. I forgot to ask about the laundry room.
- the whirlpools are staying but being redesigned for easier maintenance purposes
- the pedestal sink being replaced with a counter-top setup
- shower stall changing to one with double glass doors (he didn't consider it "kid friendly")
- all new tile in bathrooms
- king is staying
- 2 queens are staying
- roman shades are staying (yuk)
- improved kitchen lighting
- ceiling fans are staying, maybe switched out with newer models
- tall bureau in king room going - same size tvs in bedrooms
- larger tv in living room with redesigned kitchen island counter (as pictured)
Thank you!Found this video. Not hi quality but it will do. It’s a refurb 1 bedroom.
[video=youtube;02ugTPDFr1g]
Any more news on what is being worked on now?? Has turtle pond started??
The Turtle Pond Pool and associated facilities will be down for rehab April to mid-July according to an email I received, as I have a trip planned during that time.
Thanks, think I’ll wait and check it finishes before doing any room requests by touring plans for August!The following was back a few pages.
Found this video. Not hi quality but it will do. It’s a refurb 1 bedroom.
Which buildings are currently done? Still just 30-33?
Thanks!
Sure thing. I looks like some little kid had an Izakadoozie and threw up all over it.Wellll, all I know, man, is that rug really tied the room together!
Which buildings are currently done? Still just 30-33?
Thanks!
Great ty for update!buildings 30-35, 45-47, and 53-56 are done as of now