- Joined
- Feb 10, 2008
- Messages
- 20,976
I remember a sign posted at the HDDR that said if you're in site 1423 your alcoholic drinks are limited to 2, now I know why. 

I remember a sign posted at the HDDR that said if you're in site 1423 your alcoholic drinks are limited to 2, now I know why.![]()
Site 927
At first we were apprehensive about the size of the site. But we had enough room. We loved the view from the back of the site. Lots of woods between us and the 1000 loop. Across the canal we could see the 2000 loop.
Very convenient location. This is about 6 sites from the comfort station located at the front of the loop. The loop is right across the street from the Meadow/Meadows.
Tony- Great photos, as always! What level of site did you have reserved? I have upcoming ressies for a full hook up, and wondered whether they are still calling 900 full, or preferred.
Thanks,
TCD
We had a reservation for full. At the time we reserved only Full or Prem. were available. I expected to be assigned to 1600-1900. I was pleasantly surprised to get this. I expressed my surprise to the CM when we were checking in, and told him with all the upgrades I didn't expect to get this. He indicated that not everything was getting upgraded. I didn't question him further.
It seems from the timing of your posts with the pool photos we missed each other by just a short time. Daddyscooltv and family stopped by and said howdy this weekend. They were in the newly converted 1400 loop. Maybe one day you and I and our cameras will meet.
The designations have changed since they were first announced, but this information appears to be correct for when all of the work has been finished. Originally, there weren't going to be full hook ups any more, just premium, preferred, and partial. But, I think the suits backed down from their original intention of trying to pass 1600-1900 off as preferred loops. So, it looks like 100-300 will be preferred, 400-1400 will be premium, 1600-1900 will be full, and 1500 and 2000 will be partial.
When I was at the Fort last week, the 1400 loop was in the midst of its upgrade. From the looks of things, I would say it will be two to three weeks at the soonest before 1400 is ready to go. After that, 900, 1000 and 1100 all need to be done. I would be surprised if this will be done by April.
TCD