Due to the repaving operations in the south loop at MK, Coronado Springs has been moved from load zone 11 to load zone 15.
The posting said that this would be only temporary until the paving crew is done. However, they still need to repave the entrances to the "B" side load zones, so I'm sure that more changes will be coming.
The posting said that this would be only temporary until the paving crew is done. However, they still need to repave the entrances to the "B" side load zones, so I'm sure that more changes will be coming.