snappy
Survivor
- Joined
- Apr 15, 2002
- Messages
- 10,385
Thanks for asking It is going well, I have a renovated room overlooking the village green. We can see the lighted garlands around the porch area off the lobby, and the outside Christmas tree and the water a little with a big tree partially blocking it.How is your stay going? Hope you’re having a great time since the bumpy start.
Weather is good, we have spent lots of quality time with friends.
Front desk didn‘t set up our magic bands right at check in so had trouble charging our first meal at Trattoria to our magic bands, but the restaurant ended up finally calling the front desk and straightened it out. We had to go to the front desk 3 times on check in day, 2 times too many. Nice call from customer service manager, asked what had happened so I guess it was reported (we did not make a stink about it.)
The resort put a tote bag with Boardwalk printed on it with a tiny box with 4 pieces of chocolate and 2 waters in our room before we checked in so that was a nice little touch. Lots of workers spotted today further on down the third floor where the true boardwalk rooms are. Painting, checking things off on tablets. Not sure how far along they are. It smells like paint down there for sure, but the plastic barrier is down on the 3rd floor.